Water Pre-Treatment Plant at Talcher , Odisha
Services Provided :
Design, Engineering, Construction, Commissioning and O&M (1 year) |
Year :
2007 |
Client :
National Thermal Power Corporation |
Technology :
Solid Contact Reactor Clarifier |
Features :
•Pipeline (15 km above 700 mm) •Filter Water Reservoirs •Vertical Turbine Pumps (5 x 2300 M3/Hr) •Horizontal Pumps (3 x 1800 M3/Hr) |
Category: Water Treatment Plants