Environment friendly industrial growth

600 M3 / HR

  • 600  M3 / HR
  • 600  M3 / HR

Effluent Treatment Plant at Talcher , Odisha

Services Provided :

Design, Engineering, Construction, Commissioning and O&M (1 year)

Year :

2007

Client :

National Thermal Power Corporation

Technology :

Tube Settler

Features :

•Pipeline (15 km above 700 mm)

•Filter Water Reservoirs

•Vertical Turbine Pumps (5 x 2300 M3/Hr)

•Horizontal Pumps (3 x 1800 M3/Hr)

Category: Effluent Treatment Plants

Share:

0 comments

Write a comment

Leave a Reply

Your email address will not be published. Required fields are marked *